Restoration of the roof for Snamprogetti Warehouse

Brief Description of Work:

  • Mobilization of manpower, equipment and tools that required for the execution of work
  • Erection of scaffolding for roof access and safety (≈ 180 m3)
  • Removal of existing roof sheet and transport to WDA (1400 m2)
  • Fabrication of zinc gutters (≈ 70m)
  • Fabrication of zinc roof ridges
  • Installation of new gutters
  • Installation of new roof ridges
  • Installation of new roof sheets (1400 m2)
  • Removal of scaffolding
  • Cleaning and demobilization in the area

Materials to be used:

    • Pre-painted corrugated galvanized zinc sheet 0.8 mm (86 x 400cm): Qty ≈ 1600 m2
    • Pre-painted flat galvanized zinc sheet 0.6 mm (100 x 200cm): Qty ≈ 200 m2
    • Self-drilling screws stainless steel 6.3×30 mm
    • Washers stainless steel Ø50 mm
    • Silicon tube

 

Roof with new shape
During the fixing of chimneys
Installing of new sheets 3
New before chimneys
old roof general view
OLD ROOF INTERIOR VIEW 1
OLD ROOF FROM THE TOP 2
OLD ROOF INTERIOR VIEW
Fixing the gutters
Roof after removed the sheets
Roof with new shape 2
Roof after removal of chimneys
View of old gutter
view of damage
Start of removal of old sheets
Lifting of new sheets
Installing of new sheets
final
Lifting of new sheets 1
Installing of new sheets 1
team work
Roof with new shape During the fixing of chimneys Installing of new sheets 3 New before chimneys old roof general view OLD ROOF INTERIOR VIEW 1 OLD ROOF FROM THE TOP 2 OLD ROOF INTERIOR VIEW Fixing the gutters Roof after removed the sheets Roof with new shape 2 Roof after removal of chimneys View of old gutter view of damage Start of removal of old sheets Lifting of new sheets Installing of new sheets final Lifting of new sheets 1 Installing of new sheets 1 team work
Copyright © NorthFields 2022 — All rights reserved. Designed and Developed by EDGE AGENCY.